Airspace and flight procedures

Airspace design sets the sectors, routes, departures, arrivals and approaches aircraft fly. We design them to PANS-OPS and PANS-ATM, validate them by simulation and take them through approval to publication.

Jets at cruising altitude leaving contrails across a blue sky

The detailed scope on this page is published in English.

What we do

Airspace design

  • Airspace concept, classification and structure
  • Sectorisation and controller workload
  • Route network and flexible use of airspace
  • Civil and military coordination
  • Airspace change proposals and consultation
  • Drone and U-space integration with manned traffic

Instrument flight procedures

  • Departures, arrivals and approaches (SIDs, STARs and IAPs)
  • Performance based navigation, including RNP and RNP AR
  • Point in space procedures for helicopters
  • Holding and missed approach design
  • Obstacle assessment and procedure maintenance

Validation and approval

  • Fast time and real time simulation
  • Ground and flight validation
  • Safety assessment and hazard logs
  • Regulator submission and AIP publication
  • Post implementation review

Typical deliverables

Airspace concepts, change proposals, procedure design reports and charts, simulation and validation reports, safety assessments and publication packages.

Applicable standards

ICAO Annex 11, Doc 4444 PANS-ATM, Doc 8168 PANS-OPS, Doc 9613 PBN Manual, Doc 9992 PBN in Airspace Design and Doc 9906 Quality Assurance Manual for Flight Procedure Design.

Questions clients ask

How long does an airspace change take?

A procedure amendment at a single airport can be published within one or two AIRAC cycles of approval. A regional airspace redesign usually runs from twelve to thirty six months, because simulation, consultation and controller training all sit on the critical path.

Can an airport without an ILS get a precision-like approach?

Often yes. An RNP approach with vertical guidance uses satellite navigation and needs no ground equipment at the runway. The work is in the obstacle data, the design, flight validation and the approval.

Who approves a new procedure?

The civil aviation authority of the State. We prepare the design, the safety case and the publication material so the authority can approve it against its own rules and ICAO provisions.

Speak to the team that will deliver your project.

Contact us