Airport collaborative decision making, usually shortened to A-CDM, is a way of working in which the airport operator, the airlines, the ground handlers and air traffic control share the same times for every flight. Each partner still makes its own decisions. The difference is that they all make them from the same information.
The problem it solves
Without A-CDM, each partner plans from its own estimate of when a flight will be ready. Air traffic control releases aircraft in the order they call for start-up, so crews call early to secure a place. The result is a queue of aircraft at the runway holding point with engines running, while stands stay occupied longer than they need to.
The times that matter
- Target off-block time, or TOBT: the time the airline or its handler expects the aircraft to be ready, with doors closed and the bridge removed. It is the most important number in the system and it is only useful if it is honest.
- Target start-up approval time, or TSAT: the time air traffic control expects to approve start-up, worked out from every flight's TOBT, the runway capacity and any slot.
- Target take-off time, or TTOT: the expected take-off time, shared with the European network so that flow management works from real data.
In the EUROCONTROL model, each flight passes sixteen milestones, from the activation of the flight plan to take-off. Each milestone is a moment when information is updated and shared.
What the airport gets
With a reliable TSAT, aircraft wait at the stand with engines off instead of in a queue at the runway. Taxi times become predictable, stand planning improves and the network knows sooner when a flight will actually depart. The gains depend entirely on the quality of the data that goes in.
What it takes
The EUROCONTROL concept has six elements: information sharing, the milestone approach, variable taxi times, pre-departure sequencing, procedures for adverse conditions and collaborative management of flight updates. The software for each is widely available. The hard part is agreeing who owns each time, holding partners to it and keeping the procedures alive when the airport is under pressure.
In our experience the programmes that succeed spend as much effort on the working agreements between partners as on the systems.