What the authority checks before certifying an aerodrome
Every aerodrome used for international operations must be certified. Here is what the certificate rests on and how to prepare without surprises.

This article is published in English.
ICAO Annex 14 requires States to certify aerodromes used for international operations. The certificate tells pilots, airlines and insurers that the aerodrome meets the State's rules and that its operator can keep it that way. For a new airport, a major expansion or a change of operator, certification is often the last gate before opening.
What the certificate rests on
- The aerodrome manual: the operator's own description of the site, its facilities, its procedures and the people responsible. The authority audits the aerodrome against it, so it has to describe what actually happens.
- The physical aerodrome: runways, strips, runway end safety areas, taxiways, aprons, obstacle limitation surfaces, markings, lights and signs, measured against Annex 14 and the State's own regulations.
- Operations: rescue and firefighting cover for the aircraft that use the aerodrome, wildlife management, apron management, works on the movement area and how the aerodrome is inspected and maintained.
- The safety management system required by Annex 19: how hazards are identified, risks assessed and actions followed up.
ICAO gives States guidance in the Manual on Certification of Aerodromes and sets out operational procedures in the Procedures for Air Navigation Services, Aerodromes.
Where the aerodrome does not comply
Very few existing aerodromes meet every standard. Where one does not, the operator has to show how the risk is controlled, usually through a safety assessment or aeronautical study and the authority decides whether to accept it and on what conditions. A State that does not apply an ICAO standard must notify ICAO of the difference. Surprises at this stage are expensive, so known deviations belong at the start of the process.
After the certificate
Certification is not a one-off. The authority continues to inspect and audit and changes to the aerodrome or its procedures have to be assessed and notified. An operator that treats the manual as a living document finds the next audit far easier than one that wrote it to pass.
How to prepare
- Start with a gap analysis against the State's regulations, not just Annex 14.
- Survey the obstacle limitation surfaces early. Obstacles found late can change runway declared distances.
- Write the manual from how the aerodrome really works, then close the gaps in practice rather than on paper.
- Agree a timetable with the authority, including when it will inspect and what evidence it expects.
Swipe across the article to read the next one.